GF
GLOBAL FUNN
VIDEO PRODUCTION WORKSPACE
PLAN • PREPARE • REVIEW
← Newsroom dashboard
BUILD 20 • PRODUCTION CONTROL

One production flow.
Every desk connected.

Coordinate story evidence, editorial sign-off, scripts, presenter identity, graphics and media rights from one production checklist. Open each existing desk as you work.

Production brief

BUILD 20
Production checklist
0 of 9 completed
1. Story selected and desk assigned

Use a story from the newsroom queue; confirm location, date and reporting desk.

Open desk →
2. Evidence reviewed

Check primary sources, independent confirmation, attribution and unresolved claims.

Open desk →
3. Editorial review recorded

A human editor must approve the script and decide what can be stated as fact.

Open desk →
4. Presenter script prepared

Prepare English or Hindi copy, pronunciation notes and clear attribution.

Open desk →
5. Broadcast rundown arranged

Order segments, assign presenter, check timing and read the script in teleprompter.

Open desk →
6. Presenter identity checked

Confirm the selected presenter photo, name, consent and channel branding.

Open desk →
7. Graphics prepared and checked

Create matching landscape, square or vertical artwork; verify headline and source label.

Open desk →
8. Media rights and assets checked

Confirm rights, permissions, attribution and usage status for every image, clip and audio file.

Open desk →
9. Final playback and editor sign-off

Review spelling, captions, audio, visual crop, factual accuracy and corrections before release.

Open desk →
Browser storage unavailable — export a copy.